 |
 |
| |
|
|
| Pressure Reduction A.G.I installed by Rayden Engineering Ltd. for Transco Yorkshire LDZ including pre-fabrication, welding, radiography and pressure testing at our Ilkeston workshop and subsequent assembly/erection carried out on site at Sowerby Bridge, Halifax. |
|
|
|
| |
| |
|
|
|
 |
 |
| |
|
| |
 |
|